Warning: The magic method LA_IconManager::__wakeup() must have public visibility in /var/www/vhosts/baxallconstruction.co.uk/httpdocs/wp-content/plugins/superfly-menu/includes/vendor/looks_awesome/icon_manager/IconManager.php on line 753
September 2015 - Baxall Construction

KCC Framework Success

We are delighted to confirm that Baxall have been selected onto the KCC Principal Contractors Framework. Securing a place under Lot 2, the scope of projects will range from £750,000 – £6.5m on either a design and build or construct only basis. The philosophy of the...
Baxall Family Day

Baxall Family Day

The annual Baxall Family Day took place on Sunday 20th September at East Peckham Village Hall. With a large turnout of staff and their families, the afternoon was blessed with sunshine and blue skies. A hog roast was served ahead of numerous games and activities...
Cycle to Work Day 2015

Cycle to Work Day 2015

Well done to all staff who dusted off their bikes once again on September 3rd in support of Cycle to Work Day, generating a saving of 113.6km/ 42.04kg of CO². Cycle to Work Day is a national event which aims to encourage everyone to take to two wheels and cycle to...
Apprenticeship Success

Apprenticeship Success

Congratulations to Callum Setter who has successful completed his NVQ Painting & Decorating Apprenticeship. Callum joined Baxall through the TrAC Scheme back in 2013; coupled with study at West Kent College, he began his training on site at Eaton House School...